The Student News Site of Colorado State University

The Rocky Mountain Collegian

The Student News Site of Colorado State University

The Rocky Mountain Collegian

The Student News Site of Colorado State University

The Rocky Mountain Collegian

Print Edition
Letter to the editor submissions
Have a strong opinion about something happening on campus or in Fort Collins? Want to respond to an article written on The Collegian? Write a Letter to the Editor by following the guidelines here.
Follow Us on Twitter
From the Rockies to the Races: Why College Students Are Joining the Celebrity-Packed  Kentucky Derby
From the Rockies to the Races: Why College Students Are Joining the Celebrity-Packed Kentucky Derby
April 24, 2024

The Kentucky Derby, often celebrated as “the most exciting two minutes in sports,” transcends mere horse racing to become a staple of American...

Laporte closure to begin July 9 for infrastructure improvement project

Expect a full closure of Laporte Avenue starting July 9, as Fort Collins Utilities replaces outdated pipes beneath the road.

Laporte Avenue between the North Shields Street intersection to Wood Street will close until the end of construction, scheduled for August 31.

Ad

The intersection itself will remain open and those living in the nearby neighborhoods will have access to their homes at all times, according to the City. However, there may be periods when parking access is limited from Laporte Avenue.

City construction crews will replace an undersized stormwater pipe and 95-year-old sanitary sewer pipe. That is approximately 1,600 feet of stormwater pipe, 11 inlets and 650 linear feet of old wastewater pipe, in addition to repairing numerous water valves in the 900 and 1000 block of Laporte Avenue.

The street, currently composed of concrete, will then be reconstructed with an asphalt surface to reduce road noise and maintenance issues, according to a release from the City.

The Streets department will also replace damaged curb, gutter and sidewalk.

Construction will occur typically on weekdays between 7 a.m. and 6 p.m., according to the City. Those in the area can expect trenches, earth mounds, dust and noise from large equipment directly in front of their property.

Barricades and fences will also be used to mark areas of excavation. For safety reasons, the City urges residents, commuters, bike riders and pedestrians to follow all signage instructions and stay away from the marked areas.

This project is one of many infrastructure improvements scheduled for the year as part of the annual pipe replacement program.

Collegian reporter Samantha Ye can be reached at news@collegian.com or on Twitter @samxye4.

Leave a Comment
More to Discover

Comments (0)

When commenting on The Collegian’s website, please be respectful of others and their viewpoints. The Collegian reviews all comments and reserves the right to reject comments from the website. Comments including any of the following will not be accepted. 1. No language attacking a protected group, including slurs or other profane language directed at a person’s race, religion, gender, sexual orientation, social class, age, physical or mental disability, ethnicity or nationality. 2. No factually inaccurate information, including misleading statements or incorrect data. 3. No abusive language or harassment of Collegian writers, editors or other commenters. 4. No threatening language that includes but is not limited to language inciting violence against an individual or group of people. 5. No links.
All The Rocky Mountain Collegian Picks Reader Picks Sort: Newest

Your email address will not be published. Required fields are marked *