The Student News Site of Colorado State University

The Rocky Mountain Collegian

The Student News Site of Colorado State University

The Rocky Mountain Collegian

The Student News Site of Colorado State University

The Rocky Mountain Collegian

Print Edition
Letter to the editor submissions
Have a strong opinion about something happening on campus or in Fort Collins? Want to respond to an article written on The Collegian? Write a Letter to the Editor by following the guidelines here.
Follow Us on Twitter
The Impact of Technological Innovations on Sports Betting in Colorado: A Primer
The Impact of Technological Innovations on Sports Betting in Colorado: A Primer
April 18, 2024

In the sports betting domain, Colorado stands as a unique arena where technological advancements have significantly reshaped the landscape. As...

UPDATE: Mason St. construction blocking Mulberry, Myrtle, Laurel and Old Main Dr.

[UPDATE]

The Burlington Northern Santa Fe Railway (BNSF) has revised their delivery schedule due to unforeseen equipment issues, and will now be blocking Mulberry Street, Myrtle Street, Laurel Street and Old Main Drive at Mason Street starting today, July 18th, according to a press release from the City of Fort Collins.

Ad

They will stop the train along the tracks to unload rails and materials.

Detour signs will be posted, and City of Fort Collins advises you allow extra time to reach your destination.

This update was written at 8:55 a.m. by Michael Elizabeth Sakas

 

The city of Fort Collins is reconstructing Mason street, originally a one-way street, to accommodated for two lane traffic. This construction will also support the construction of the MAX Bus Rapid Transis system, a new route beginning in May 2014. This entire length of the transit construction is expected to last for about 18 months. This route will consist of 12 stops along the Mason Corridor.

Below is a timeline of the July construction and closure plan for Mason street.

July 23 – 29: Burlington Northern Santa Fe Railroad Track Replacement

  • Mason street closed for traffic from Cherry St. to north of Laurel St.
  • Laurel St. intersection closed during end of week for maintenance

July 16 – 22 

Ad

  • Mason street closed to traffic
  • Mason sidewalks open

July 23 – 29

  • Mason street closed to traffic from south of Cherry St. to north of Laurel St.
  • Cherry street open
  • Laurel closed mid-week for railroad track replacement
  • Mason sidewalks open
  • A free shuttle will operate Monday-Saturday from 6:30 a.m. to 6:30 p.m. and Sunday from 9:30 a.m. to 5:30 p.m. around the road closures. Stops will be located on Howes St. and College Ave. and will pick up passengers every 10 minutes.

July 30 – August 3

  • Mason street closed to traffic
  • East and west intersections closed
  • Mason sidewalks open

 

View Comments (5)
More to Discover

Comments (5)

When commenting on The Collegian’s website, please be respectful of others and their viewpoints. The Collegian reviews all comments and reserves the right to reject comments from the website. Comments including any of the following will not be accepted. 1. No language attacking a protected group, including slurs or other profane language directed at a person’s race, religion, gender, sexual orientation, social class, age, physical or mental disability, ethnicity or nationality. 2. No factually inaccurate information, including misleading statements or incorrect data. 3. No abusive language or harassment of Collegian writers, editors or other commenters. 4. No threatening language that includes but is not limited to language inciting violence against an individual or group of people. 5. No links.
All The Rocky Mountain Collegian Picks Reader Picks Sort: Newest

Your email address will not be published. Required fields are marked *